Structural glass facade of modern office building. Abstract architecture fragment.

Glasstec 2026

Building the next chapter of high-performance facades

Dow at Glasstec 2026

Advancing the future of glass and façade performance. Explore the new façade renovation program, next generation of structural bonding and innovation for high-performance facades, incorporating a new Power Edge System that brings performance and durability to the next level.

The Façade Renovation Program

Supporting façade renovation and life extension of existing façades through silicone assessment, glass reuse, non-destructive disassembly, and data-driven carbon insights to support smarter renovation decisions.

Review. Reuse. Re-Bond. Extend.

Keeping existing façades in service can create environmental and economic value. Dow's Façade Renovation Program combines silicone expertise, glass reuse, façade assessment, and circular design principles to help extend façade life, reduce waste, and support lower-carbon renovation strategies. Through real-world projects and industry collaboration, the program is exploring how existing façades can remain valuable resources for the future.

Review

Judge the silicone in the existing units, so renovation can be weighed against replacement on evidence.

Re-use

Give recovered glass a second life as a backed panel, using the DOWSIL™ 7094 approach.

Re-bond

Take units apart intact and bond again, designing today for the disassembly of tomorrow.

Workstreams at different stages of maturity

Our solutions in action

Giving existing glass a second life

Working with Lüchinger Meyer Partner, glass from an existing building is being given a second life in a new façade, using the DOWSIL™ 7094 approach: existing glass panels were prepared, assembled, cured and installed on site using the DOWSIL™ 7094 approach. Impact and fire performance were also investigated.

  • Existing glass coated with DOWSIL™ 7094 and backed with a metal sheet.
  • Panels assembled and cured off site before installation.
  • Impact and fire performance investigated.
  • “Project of the Year 2025 – Sustainability (International) SFE award, with Lüchinger Meyer Partner. Delivered on-site, the solution also enables off-site application for greater project flexibility.
Cityscape and skyline of downtown near water of Chongqing at night

Have a similar project? Let’s talk

The program continues to evolve, and we are looking for projects and partners to help advance it. Dow’s contribution covers the silicone materials; façade design, inspection and renovation decisions remain with the project team.

Futuristic 3D rendering concept image of city skyscrapers stretching above the clouds

DOWSIL™ Power Edge System

One edge. One System.

The Power Edge System for insulating glass combines new spacer innovation with high performing structural silicones, benefitting from 50+ Years of durability and expertise. 

It is ready to be integrated into structural glazing facades, captive designs and windows.

One Edge. One System. Built to last.

The core is the new DOWSIL™ Power Edge 3000, a silane-enhanced reactive thermoplastic spacer. The backbone is the higher strength and fast curing structural DOWSIL™ 3363 Silicone sealant, which provides up to 30% higher strength. 

Slimmer sightlines

A narrower edge and a cleaner sightline, so more of the unit is glass and daylight.

Greater design freedom

Wider cavities, cold-bent and curved units, and more freedom to shape the façade.

More compliant under load

A compliant edge accommodates movement and redistributes local edge deformation under modelled loading conditions.

The core: DOWSIL™ Power Edge 3000

DOWSIL™ Power Edge 3000 glass illustration | Reactive Thermoplastic Spacer

Silane-enhanced Butyl

  • Gas- and moisture barrier
  • Integrated desiccant moisture uptake capacity
  • Chemical adhesion to glass and secondary silicone at One Edge. One Fusion 
  • The Warm Edge
  • Fully automated application
  • EN1279 tested (ift Rosenheim)

Carbon net zero, project specific

Key benefits

Less is more 

15% smaller spacer thickness

  • 15% material savings
  • 15% less thermal conductivity

Design with flexibility

Cavity size up to 25mm

  • Acoustics application
  • Blinds integration
DOWSIL Power Edge 3000 | USP_Cavity Size 25mm V2

Very high green strength

  • Higher glass loads, larger glass sizes
  • Enhanced handling safety
DOWSIL™ Power Edge 3000 lifting illustration | USP Lower Creep | glass
Sliding during glass lifting can impact gas-tightnes & durability

The Backbone

DOWSIL™ high strength and fast cure silicones, powered by 50+Years Performance.

DOWSIL™ High Strength Silicones

DOWSIL™ 3365 High Strength Silicone (US)

DOWSIL™ 3363 High Strength Silicone (EU)

Designed to reduce edge stress and spacer movement

Secondary sealant 

  • Up to 30% higher strength
  • Accomodating static and dynamic loads 
  • Carbon neutral by project

Benefitting from decades of durability and expertise

System benefits

From reduced edge stress to enhanced performance and durability

Performance warranty

Carbon net zero EDGE – by project

Performance supported by testing and modeling

PowerSG 9000 glass chart
Upward perspective of a modern glass building with reflective geometric panels capturing a colorful sunset sky. The symmetrical lines converge toward the center, emphasizing height, innovation, and contemporary design.

Talk to our experts

Let’s discuss your application and access the latest material characterization data.

Looking up at the glass facade of a modern office building. / Shutterstock Image #387068884

Innovation Preview - Structural Glazing

The Translucent Structural Silicone Strip. 

A pre-cured structural silicone strip supplied in a controlled geometry. After contact with the prepared substrate, the interfacial bond develops chemically in place, supporting faster handling of assembled units.

*Innovation preview. Preliminary, lab-scale concept under development with partners.

Simple. Safe. Sustainable.

Delivered through productivity, reliability and material-efficiency benefits.

Productivity

In preliminary laboratory testing, handling strength developed approximately one hour after contact. Fewer steps on the bonding line, with no mixing, no mix-ratio checks and no pump flushing at assembly.

Reliability

The strip brings its own bond-line geometry — fewer operator-dependent tolerances and translucent enough to inspect the bond line.

Sustainability

A leaner bond that uses less silicone and reduces aluminum use, drops the spacer tape, and stays soft enough to cut for disassembly at the end of life.

From strip to bonded unit

A cured strip, a primer and an hour of contact time. Here is the sequence of assembly and the chemistry that makes it hold.

The bonding sequence

Profile

The strip arrives pre-applied on the profile and is cut to length directly.

Prime

A few minutes for the primer to react with the glass surface.

Connect

Glass and profile are aligned before controlled contact is made.

Handle

Adhesion builds in place; the unit is ready to handle after about an hour.

What it does for production

  • Controlled upstream manufacture. The bond line is made and cured in the factory rather than at assembly.
  • Predefined geometry. Bite and thickness come with the strip, not from operator technique.
  • Fewer wet-processing steps. No pumping equipment, no mix-ratio checks, no silicone logistics.
  • Faster progression to handling. Approximately 1 hour to the defined handling criterion*. Against 24–48 hours for a conventional wet-applied joint, potentially supporting same-shift handling, subject to scale-up validation and production conditions.

*0.7 MPa maintained for 10 seconds in the Roman balance test. Preliminary laboratory data.

Less Material, More Glass

Compare conventional wet-applied structural glazing with Power SG 9000 to see how a thinner bond line can reduce the overall joint, use less material per unit, and enable a leaner façade section with more visible glass.

What it does for the façade

  • 100% Silicone. Silicone Chemistry, UV-resistant and non-yellowing. 
  • Translucent. Reads as light rather than a black line, allows the bond line to be inspected and can be pigmented. 
  • Slimmer sightlines, more glass. A narrower joint puts less frame in view and more visible glass in the same opening.
  • Movement at a thinner joint. Preliminary material data indicate that the 3 mm strip geometry retains movement capability for the investigated conditions.
  • Leaner, and easier to disassemble. Less silicone and aluminium per unit. The thinner, softer joint allows easier cutting during disassembly than a thicker conventional wet-applied joint.
Digitally rendered image of structural glazing. Modern architecture fragment with glass wall, ceiling or roof made of transparent panels. Abstract geometric background with checkered or grid pattern.

Go deeper into the technology

Detailed material and structural-glazing research presented at the Challenging Glass Conference 2026 in Delft.

Interested in evaluating Power SG 9000?

We are looking for partners to support profile design, production integration and application mock-ups across cast glass, unitized façades and other concepts