United Kingdom
About Us Applications Products Resources Case Studies Contacts  
 

Installation

Installation sequence

  1. Fix a 60mm thick timber stop batten across the rafters at eaves (Figure 5).

  2. Figure 5

  3. Lay ROOFMATE™ RL-X boards with long edges at right angles to the rafters and with the tongue pointing up the slope (Figure 6).

  4. Figure 6

  5. Butt the first row of boards tight against the stop batten. Continue laying up the slope towards the ridge. At ridge butt ROOFMATE RL-X to the ridge board (Figure 6) or to ROOFMATE RL-X on the opposite slope. (Figure 7).

  6. Figure 7

  7. Fix ROOFMATE RL-X boards temporarily by occasional nailing until permanently secured by the counter battens.
  8. At all cut edges, junctions and penetrations trim ROOFMATE RL-X boards neatly to fit (Figures 8 and 9). Seal any gaps with polyurethane foam.

  9. Figure 8 Figure 9

  10. either:
    (a) lay the underlay directly onto the ROOFMATE RL-X boards and secure with counter battens; or
    (b) secure the ROOFMATE RL-X boards with counter battens, then drape the underlay over the counter battens and secure with tiling/slating battens. (Refer to underlay supplier’s instructions).
  11. Fit ROOFMATE RL-X boards cut-to-size between the rafters from within the loft space. Press tight against the ROOFMATE RL-X boards and fix by nailing support battens to the rafters (Figure 10).

  12. Figure 10

Key points

  • Ensure ROOFMATE RL-X boards interlock tightly.
  • Cut and fit boards neatly.
  • Seal any gaps, particularly at cut joints.
  • Do not stand on ROOFMATE RL-X or use as a working platform.