Waste

    
  
 

Waste
In 2001, our product range was diversified and specific products with a high waste rate were introduced. Six Sigma methodology is used to define and implement improvement projects.

Waste
 

Waste Water
We achieved a significantly lower load on our biological treatment plant in 2001 when a production plant was closed. The present level is minimal and represents sanitary effluent as well as effluent caused by plant shutdowns.

 
Waste Water